Image from Google Jackets
Image from OpenLibrary

Effect of inadequate design on cost and time overrun of road construction projects in Tanzania: a case study of Central Corridor road up grading projects

By: Material type: TextTextPublication details: Dar es Salalam: University of Dar es Salaam, 2010Description: xiii,93p.: ill.; 30cmSubject(s): LOC classification:
  • THS EAF TE175.T34E3
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF TE175.T34E3 (Browse shelf(Opens below)) Not for loan 000000337191
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF TE175.T34E3 (Browse shelf(Opens below)) Not for loan 000000337192

Includes bibliographical references
Thesis: M.Sc (High way Engineering) -Univerity of Dar es Salaam

There are no comments on this title.

to post a comment.
Copyright © All rights reserved. University of Dar es Salaam, Directorate of Library Services
Powered by Koha. Installed, Configured, and Customized by the Library ICT Department