Edwad, Eradius

Effect of inadequate design on cost and time overrun of road construction projects in Tanzania: a case study of Central Corridor road up grading projects - Dar es Salalam: University of Dar es Salaam, 2010 - xiii,93p.: ill.; 30cm.

Includes bibliographical references
Thesis: M.Sc (High way Engineering) -Univerity of Dar es Salaam


Road construction projects
Highway design, Tanzania

THS EAF TE175.T34E3